In 2025, OTUS completed a multi-year digital transformation program, on time, on budget, and within scope. This program represents a major shift in how the US terminals are operated and managed. Beyond replacing manual and paper-based routines, the program has tightened cost discipline and improved operational safety and productivity. Improved access to real-time operational data has enhanced coordination between commercial and operational teams, supporting stronger margins and a reputation for reliability.
With the core digitalization program delivered, OTUS will now focus on optimizing and further embedding the new systems, ensuring that the benefits achieved are sustained and scaled over time.
Expansion in Antwerp
For nearly a decade, expansion at Noord Natie Odfjell Antwerp Terminal (NNOAT) has followed a clear and disciplined trajectory, with capacity added in phases while maintaining high utilization. In 2025, two expansion projects were completed as part of the terminal’s long-term development roadmap: Tankpit R added 27,500 cbm across ten tanks, followed by Tankpit Q with 12,000 cbm of stainless steel capacity. Both projects were delivered safely, on time, and on budget.
Groundwork also commenced late in the year on the next expansion phase, Tankpit S, comprising 18 duplex steel tanks with a total capacity of approximately 36,000 cbm. The duplex design provides operational flexibility and allows for future adaptation to a broader range of products. Looking ahead, the terminal has potential to develop further capacity of up to 80,000 cbm.